Commercial Projects


10 Gresham Street
London EC2

Client/Owner
Standard Life Assurance Company
Architect
Forster & Partners
Main Contractor
Bovis Lend Lease Ltd
Consulting Engineer
Waterman Partnership
Quantity Surveyor
Davis Langdon & Everest
Main Frame Fabricator
Severfield-Reeve Structures Ltd
Total Project Tonnage
3270 tonnes
Fabsec Beam Tonnage
1560 tonnes


Key Project Facts

The structure is an office development consisting of an eight storey superstructure and two storey concrete and steel basement constructed around and within an existing single storey basement.

The fabricator's scope included design connections and detail. Plus the supply, fabrication intumescent coating and erection of structural steelwork as well as installation of metal decking and steel stairs.