Commercial Projects


The Point
Paddington Basin, London

Client/Owner
Chelsfield plc
Architect
Terry Farrell & Partners
Main Contractor
Bovis Lend Lease
Consulting Engineer
Pell Frischmann
Quantity Surveyor
Gardiner & Theobald
Main Frame Fabricator
Rowen Structures Ltd
Total Project Tonnage
2100 tonnes
Fabsec Beam Tonnage
380 tonnes


Key Project Facts

The building consists of a 13 storey office block for letting with deep basement. Steelwork was designed using FBEAM by Rowen Structures Ltd and can be viewed via the Chelsfield website: www.paddingtonbasin.co.uk.

©2004
Tel: +44 (0) 845 094 2530
-
Fax: +44 (0) 845 094 2533
-