Market Sector: Commercial
Offices
Client: More London Developments
Location: London
Country: England
Project Partners: Management
Contractor: Mace Ltd
Architect: Foster & Partners
Engineer: Arup
Project Key Stats: Total
Tonnage: 1,540 tonnes
Site Programme: 15 weeks
Completion Date: December 2005
Project Overview:
As part of the More London development on the south bank of the
Thames between London and Tower Bridges, Severfield-Reeve carried
out connection design, fabrication and erection of 1,540 tonnes of
structural steelwork, of which 936 tonnes were FABSECĀ® beams with
service holes profiled into the webs.
The steelwork was generally supplied with an off-site intumescent
coating to give a fire rating of 60 minutes. Also included within
the steelwork package was the supply and fixing of metal decking,
edge protection and steel stairs.
This project was a creditable health and safety performance with
the Group's "Off-Load Safe" unloading procedure used
extensively. (Top Photograph show plots 3 & 4).