The Shard at London Bridge, Southwark
Market Sector: Commercial
Offices
Client: Teighmore Construction
Location: Southwark
Country: England
Project Partners: Main Contractor:
Mace Group
Architect: Adamson Associates
Engineer: WSP Cantor Seinuk
Project Key Stats: Total Tonnage:
12,700 tonnes
Site Programme: 50 weeks
Completion Date: January 2011
Project Overview:
On completion The Shard London Bridge will become the tallest
building in Western Europe standing at 310m and will provide
approximately 55,800sqm of hotel, luxury residential accommodation,
and office space.
Severfield-Reeve Structures are responsible for the connection
design and fabrication of approximately 12,500 tonnes of structural
steelwork, of which 7,500 tonnes were coated with fire protection
paint and 6,000 tonnes were Fabsec plated beams with bespoke
service openings. The Company also supplied and fixed the metal
decking, edge protection and stairs throughout. The Group's
in-house company Steelcraft Erection Services was utilised for the
erection of the steelwork.